Panasonic U-72MF1U9 Technical Data Manual page 56

3way vrf system
Hide thumbs Also See for U-72MF1U9:
Table of Contents

Advertisement

5. HOW TO PROCESS TUBING
5-3. Insulating the Refrigerant Tubing
Tubing Insulation
Thermal insulation must be applied to all unit tubing,
including the distribution joint (purchased separately).
(Fig. 2-25)
* For gas tubing, the insulation material must be heat
resistant to 248°F or above. For other tubing, it must
be heat resistant to 176°F or above.
Insulation material thickness must be 25/64 in. or
greater.
If the conditions inside the ceiling exceed DB 86°F
and RH 70%, increase the thickness of the gas
tubing insulation material by 1 step.
CAUTION
1
2
Taping the flare nuts
Wind the white insulation tape around the flare nuts at
the gas tube connections. Then cover up the tubing
3
connections with the flare insulator, and fill the gap at the
union with the supplied black insulation tape. Finally,
fasten the insulator at both ends with the supplied vinyl
clamps. (Fig. 2-26)
4
5
6
7
8
If the exterior of the outdoor
unit valves has been finished
with a square duct covering,
make sure you allow
sufficient space to use the
valves and to allow the
panels to be attached and
removed.
Two tubes arranged together
Liquid tubing
Insulation
Three tubes arranged together
Cosmetic
(finishing) tape
Liquid tubing
Insulation
Four tubes arranged together
Discharge tubing
Balance tubing
Insulation
Sealer (supplied)
Unit side
insulator
Flare nut
2 - 42
Design of 3WAY VRF SYSTEM
Gas tubing
Gas tubing
Balance tubing
Cosmetic
(finishing) tape
Suction tubing
Liquid tubing
Fig. 2-25
Insulation tape (white)
(supplied)
Flare insulator (supplied)
Tube insulator
(not supplied)
Heat resistant
248°F or above
Vinyl clamps (supplied)
Fig. 2-26

Advertisement

Table of Contents
loading

This manual is also suitable for:

U-72mf1u9eU-96mf1u9U-96mf1u9e

Table of Contents