Laying The Underground Base - Huawei F01T500 Quick Installation Manual

Cabinet
Table of Contents

Advertisement

5 Installing the Cabinet on an Underground Base

5.3 Laying the Underground Base

NOTICE
The underground base is heavy. This process requires multiple-person collaboration. Protect the underground base from
damage. Any crack or exposure of glass fiber on the post or panel caused by tool collisions is not allowed.
The pre-buried cables (or pipes) must rise slightly above the ground.
After the cables (or pipes) are pre-buried, use sealing materials to seal the cables (or pipes) outlet to prevent water
intrusion.
Gently place the underground base on the
concrete in the foundation pit, and use a spirit
level to level the underground base.
Pre-bury cables (pipes) at the cable hole position on the underground base with the help of the line-drawing template
for the cabinet (type II).
Line-drawing Template for Cabinet (Type II)
Cable hole
Cable (or pipe)
Lay 75-mm-deep concrete (with the same
concrete ratio) evenly at the bottom of the
underground base. Use a spirit level to level the
underground base.
25
Cable (or pipe)

Advertisement

Table of Contents
loading

Table of Contents