Huawei F01T500 Quick Installation Manual page 82

Cabinet
Table of Contents

Advertisement

13 Sealing the Cabinet
After the engineering installation of the cabinet is completed and before the device is powered on, to avoid the
condensation in the cabinet, you must remove the packaging bag from the desiccant (four packages) that is attached to
the cabinet. Place two packages at the bottom of the device compartment and place the other two packages at the bottom
of the MDF compartment. Remove the desiccant packages only when the device is powered on next time.
After cables are led in to the MDF compartment, seal the cable holes by tightening the strings of the cable sealing bags
(4 PCS).
The cabinet base that contacts with the concrete pedestal must be sealed to prevent moisture air from entering the
cabinet.
Cover the sealing mud onto the cable hole at the bottom of the cabinet to seal the cable hole gap and the gaps among
cables.
When the cabinet is configured with a power meter box, seal the cable hole at the left side of the cabinet by using the
sealing mud.
Sealing
grease
77
Cable
sealing bag
Waterproof
silicone
Sealing
grease

Advertisement

Table of Contents
loading

Table of Contents