Installation And Preparation - Sharp UH-3 Operations Manual & Parts List

Horizontal milling machine
Table of Contents

Advertisement

2. Installation and preparation

2-1 Transportation of the machine
Make certain the load is on balance and that the sling does not touch the table or head before lifting.
If a crane is used in lifting, exercise care that none of the mechanism is damaged.
When lifting the machine, insert two round bars of about 35mm in diameter and use a wire
suspension rope, be certain that they are strong enough to safety carry the weight of the machine.
The finished surface of the machine must be protected by using wooden blocks and cloth.
Fig. 2
Chung Sing 4
VERSION: 2

Advertisement

Table of Contents
loading

Table of Contents