Download Print this page

Toro 2226 Quick Start Manual page 25

Directional drill
Hide thumbs Also See for 2226:

Advertisement

DANGER
If the Zap-Alert system activates while drilling, the
machine, except for the operator's platform, will
become energized. If you step off the operator
platform or if someone touches the machine or wet
ground near the machine or in the bore, you or
they could be electrocuted causing serious injury
or death.
• Test the Zap-Alert system before drilling.
• Deploy the grounding stake before drilling.
Ensure that the stake is fully inserted into moist
soil.
• If the Zap-Alert is triggered:
– Stay in the seat and do not touch the ground
or any other part of the machine until the
power has been turned off. Do not pour
liquids or urinate from the operator platform
onto the ground.
– Stop drilling, stop the drilling-fluid flow, and
retract the drill out of the ground.
– Keep everyone away from the machine,
wet ground near the machine or running
from the machine, and any open sources of
water/mud that is in the bore and contacting
the broken line.
– Contact the utility company to have power
shut off to the broken line. Do not reset the
Zap-Alert system until the power has been
turned off.
1. Remove the grounding stake from the holder on the
side of the operator platform
Figure 27
1. Grounding stake
2. Move the stake directly away from the machine,
perpendicular to the drill frame and drive it into the
ground until the handle touches the ground.
3. If the ground is dry where you put the stake, soak it
with water before using the machine to ensure good
electrical contact.
(Figure
27).
g194740
Drilling the Bore
Starting the First Pipe
1. Ensure that all bystanders are away from the machine
and that the exit-side lockout is On.
2. Move the drill carriage fully down the drill frame and
spray the spindle threads with thread joint compound,
then return the drill carriage to the upper end of the
frame
(Figure
27).
1. Drill spindle
3. Rotate the pipe gripper to the first row of pipes in
the pipe holder by aligning the row indicator to row
number 1.
4. Lower the pipe elevators to load a pipe into the pipe
gripper.
5. Rotate the pipe gripper with the pipe toward the drill
frame, and extend the pipe until the pipe is centered
over the frame and in front of the spindle on the drill
carriage.
6. Rotate the drill spindle clockwise and move the carriage
slowly forward to insert the spindle into the female end
of the pipe
(Figure
25
Figure 28
2. TJC-applicator nozzle
29).
g023075

Advertisement

loading

This manual is also suitable for:

23803