GE AMX-4+ Technical Publications page 4

Hide thumbs Also See for AMX-4+:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 10
If you have any comments, suggestions or corrections to the information in this document,
please write them down, include the document title and document number, and send them to:
CERTIFIED ELECTRICAL CONTRACTOR STATEMENT
All electrical installations that are
preliminary to positioning of the
equipment at the site prepared for
the equipment shall be performed by
licensed electrical contractors. In
addition, electrical feeds into the
Power Distribution Unit shall be
performed by licensed electrical
contractors.
Other
connections
between
pieces
of
equipment, calibrations, and testing
All packages should be closely
examined at time of delivery. If
damage is apparent, have notation
damage in shipment" written on
all copies of the freight or express
bill before delivery is accepted or
signed for" by a General Electric
representative
or
a
receiving agent. Whether noted or
concealed, damage MUST be
reported to the carrier immediately
GENERAL ELECTRIC COMPANY MEDICAL SYSTEMS
MANAGER − INFORMATION INTEGRATION,
AMERICAS W−622
P.O. BOX 414
MILWAUKEE, WI 53201−0414
shall be performed by qualified GE
Medical personnel. The products
involved (and the accompanying
electrical installations) are highly
sophisticated,
engineering competence is required.
In performing all electrical work on
these products, GE will use its own
specially trained field engineers. All
electrical
of GE's electrical work on these
products
will comply
DAMAGE IN TRANSPORTATION
upon discovery, or in any event,
within 14 days after receipt, and the
contents and containers held for
inspection
transportation company will not pay
a claim for damage if an inspection
is not requested within this 14 day
hospital
period.
Call Traffic and Transportation,
Milwaukee, WI (414) 827−3449 /
(MODEL 2169360, 2236420 & 2275938 SERIES)
and
special
with the
by
the
carrier.
A
ii
AMX−4+ OPERATION
om 2166913−100
requirements
of
the
electrical codes.
The purchaser of GE equipment
shall only utilize qualified personnel
(i.e., GE's field engineers, personnel
of third-party service companies with
equivalent
training,
or
electricians) to perform electrical
servicing on the equipment.
8*285−3449
immediately
damage is found. At this time be
ready to supply name of carrier,
delivery date, consignee name,
freight or express bill number, item
damaged and extent of damage.
Complete instructions regarding
claim procedure are found in
Section
S" of the Policy &
Procedure Bulletins.
applicable
licensed
after
6/17/94

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents