Download Print this page

Sealey GSS3030G Instructions Manual page 17

Galvanized steel shed green 3 x 3 x 2.1m

Advertisement

8.6.2. Take the two ridge beams (73) and place together the ends marked with a red arrow. Place the ridge beam
connector (67) over the joint and align the fixing holes. Place gable caps (69) onto the ridge beams and cover the joint
with the gable cap connector. FIx the whole structure together using 16mm self tapping screws
8.6.3. Take one roof panel and identify on which side of the panel the channels 27E and 27F are fixed. Slide or insert
this side of the panel into one side of the ridge beam assembly that you have just created as indicated above.
Original Language Version
© Jack Sealey Limited
GSS3030G
Issue: 1 - 28/08/14

Advertisement

loading