Mitsubishi Electric E1070 Installation Manual page 10

Hide thumbs Also See for E1070:
Table of Contents

Advertisement

Installation
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
B
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
C
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
D
Caution
- The operator panel must be brought to ambient temperature
- Ensure that the voltage and polarity of the power source is correct.
5. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
10
x 6
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
B
RS422/RS485
24V DC
RS232
C
D
A
Ethernet
0.5 - 1.0 Nm
2
.
Power
Controller
24V DC
Mitsubishi Electric, MA00776C