Installation; Space Requirements; Installation Process - Mitsubishi Electric E1070 Installation Manual

Hide thumbs Also See for E1070:
Table of Contents

Advertisement

2

Installation

2.1 Space Requirements

– Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
– Space requirements when installing the operator panel:
177 mm
(6.97 inch)
50 mm
(2.0 inch)
Caution
The openings on the enclosure are for air convection. Do not cover these
openings.

2.2 Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator panel is to be situated, draw along the
outer sides of the holes and cut according to the markings. If access to the text
strip is needed, add extra space in the lower left corner.
Mitsubishi Electric, MA00776C
100 mm
(4.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
285 mm
(11.22 inch)
Panel cut out 245.5 x 138.5 mm
x 6
For text strip
18.0 mm
(0.71 inch)
100 mm
(4.0 inch)
56 mm
(2.20 inch)
.
(9.67 x 5.45 inch)
5.0 mm
(0.20 inch)
Installation
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents