GE CEX57D Instructions Manual page 10

Angle-impedance relay
Hide thumbs Also See for CEX57D:

Advertisement

Apply
percent of rated DC voltage to studs
75
Close the left contact of both induction cylinder units.
pick up.
LOCAT ION
The relay should be installed in a location that is clean, dry, free from dust,
and well lighted to facilitate inspection and testing.
M OUNTING
The relay should be mounted on a vertical surface. The outline and panel drilling
dimensions are shown in Figure
CONNECT IONS
The internal connections diagrams f or the relays are shown in Figures 9,
An elementary diagram of typical external connections is shown in Figure
11.
VISUAL INSPECTION
Remove the relay f rom its case and check that there are no broken or cracked
component parts, and that all screws are tight.
M ECHANICAL INSPECT ION
Recheck the seven adjustments detailed in the M ECHANICAL INSPECT ION section of
ACCEPTANCE TESTS.
Before placing a relay into service, the f ollowing mechanical adjustments should
be checked:
ANGLE-I M PEDANCE UNIT
There should be n o noticeble friction in the rotating structure of the unit.
unit's moving contacts should just return to the right contact when the relay is de­
energized and in the vertical position.
There should be approximately
rotating structure. The lower jewel screw bearing should be screwed firmly into place,
and the top pivot locked in place by its set screw.
If the jewel should become cracked or dirty, the screw assembly can be removed
from the bottom of the unit and examined.
engaged in the shaft while screwing in the jewel screw.
GE K-49778
INST ALL ATION PROC EDURE
14.
INSP ECTION
to
0.005
0.010
When replacing a jewel, have the top pivot
14
and
with plus DC on stud
1
11,
The auxiliary relay should
inch end play in the shaft of the
11.
and
10
5.
The