Download Print this page

Toshiba TCB-DP31DE Installation Manual page 4

For concealed duct high static pressure type

Advertisement

1
Precautions for Safety
• Read this "Precautions for Safety" carefully before Installation.
• The precautions described below include the important items regarding safety.
Observe them without fail.
• After the installation work, perform a trial operation to check for any problem.
• Turn off the main power supply switch (or breaker) before the unit maintenance.
• Ask the customer to keep the Installation Manual together with the Owner's Manual.
• Ask the dealer or a professional about installation.
• Install the Drain pump kit securely following this Installation Manual.
• When reinstalling the Drain pump kit, ask the dealer or a professional.
Improper installation may result water leakage, electric shock or fire.
• Turn off the main power supply switch or breaker before attempting any electrical work.
Make sure all power switches are off. Failure to do so may cause electric shock.
• Connect the connecting wire correctly.
If the connecting wire is connected in a wrong way, electric parts may be damaged.
• Do not modify this unit by removing any of the safety interlock switches.
• To avoid personal injury (with sharp edges), be careful when handling parts.
• Use the specified wires for wiring connect the terminals securely fix.
To prevent external forces applied to the terminals from affecting the terminals.
REQUIREMENTS
• Check the level of the air conditioner.
It should be level, or tilted no more than 1 degree (with the drain port side lower).
• Place where a sufficient servicing space can be ensured for safe maintenance and check.
• Place where drained water will not cause any problem.
WARNING
1

Advertisement

loading