▼ Volume of the heating system
You must maintain the minimum installation water
volume. Install a buff er tank on the return from the
heating circuit in case the volume is lower than this
value. Where the system is fi tted with one or more
thermostatic valves, you must ensure that this minimum
water volume is able to circulate.
Heat pump
Model 5
Model 6
Model 8
Model 10

DHW circuit

Mandatory : On the cold water inlet, place a safety valve
calibrated to between 7 and 10 bar max. (depending on
local regulations) and connected to a drain pipe leading
to the sewer. The discharge pipe must be kept open
in the open air. The discharge pipe must be installed
in an environment kept frost-free and in a continuous
downward slope. Operate the safety valve according to
manufacturer's specifi cations. The domestic hot water
tank must be fed with cold water passing through a
safety valve. There must be no other valves between
the safety valve and the tank.
We recommend installing a thermostatic mixing valve
on the hot water outlet.
P
fi g. 38 - Hydraulic unit automatic bleeder valve
Waterstage Split Comfort DHW Serie / INSTALLATION / 2125 - EN
Min. volume in litres PER CIRCUIT (excl. HP)
Mandatory
Fan-coil
23
23
36
49
Check the pipe fi xings, tightness of the connectors and
the stability of the hydraulic unit.
Check the direction in which the water is circulating and
that all the valves are open.
Proceed to fi ll the installation.
Do not operate the circulation pump during fi lling.
Open all the drain valves in the installation and the
bleeder valve on the hydraulic unit (P) to expel the air
contained in the pipes.
Close the drain valves and add water until the pressure
in the hydraulic circuit reaches 1 bar.
Check that the hydraulic circuit has been bled correctly.
Check there are no leaks.
After the
once the machine has started, bleed the hydraulic unit
again (2 litres of water).
Recommendation
Radiators
15
15
33
44

Filling and bleeding the installation

"
Commissioning", page 46
Precise fi lling pressure is determined by the
water pressure in the installation.
Recommendation
Heating-cooling fl oor
15
15
15
22
stage, and
- 33 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents