Installation Planning; Unpacking The Ksu - LG Aria-34e Installation Manual

Table of Contents

Advertisement

Aria-34e
Digital Key Telephone System

4.3 INSTALLATION PLANNING

a) Aria-34e system has been designed as a plug-in card/unit type system to provide up to
38 port user capacity, with a maximum of 34 extension ports or CO Line ports.
b) Plug-in boards such as LCOB, 4LCO, ETIB, DTIB, SLIB, 4SLI, DVIB can be installed
in the system as required to expand system capacity.
c) New software packages with enhanced features will be commercially available as
advised by Aria Communications.

4.4 UNPACKING THE KSU

a) Remove the Key Service Unit from shipping carton and stand it upright on the level
working surface with the cover facing forward. Turn the 4 screws on the sides of the
cabinet and remove. Remove all packing materials from inside the KSU and inspect for
shipping damage. The KSU should be empty when received. Inside the KSU packing
should be a mounting template. The mounting template includes mounting dimensions
for the expansion cabinet.
b) The items listed below are needed to have an operating system. The number and type of
plug-in cards needed depends on the size of the system being installed.
KSU
Desired Interface Cards
1 x 27 Way Krone Frame With Lid
Installation Tails
Digital Keystation(s).
Aria Communications Pty Ltd.
A.C.N. 090 723 925
4-2
Installation
Rev 1.3

Advertisement

Table of Contents
loading

Table of Contents