Preparation for Installation

To ensure normal operation and prolonged life
of the DGS-6600 series chassis switch, the
appropriate temperature and humidity must be
maintained in the equipment room.
If the equipment room's temperature and
humidity do not meet the requirements. the
equipment may sustain damage.
Operating Temperature
0ºC-50ºC
Table 1. Temperature and Humidity Requirements
Notes:
1. The ambient temperature and
humidity should be measured
at the point that is 1.5m above
the floor and 0.4m in front of the
equipment when there is no pro-
tective plate in front or back of the
equipment rack
2. The short-term working condi-
tions apply where the continuous
working period does not exceed 48
hours and the cumulative total pe-
riod within a year does not exceed
15 days
Static Discharge Damage Prevention
To prevent damage from static electricity,
please conform to the following guidelines:
1. Be sure to install an adequate ground for
all electronic equipment.
2. Use appropriate dust prevention measures.
3. Maintain the required humidity in the
operating environment
4. Always wear an anti-static wrist strap when
working around any electronic circuitry.
5. Hold a circuit board by its edges. Do not
touch any components on the PCB.
6. Do not allow clothing to touch a circuit
board. An antistatic wrist strap can only
prevent static electricity from the human
body, but cannot mitigate static electricity
from clothing.
Operating Humidity
10%-90% RH
non-condensed

Moving the Device

The DGS-6600 series chassis switch is quite
heavy. When handling, please pay close
attention to the following guidelines:
Avoid moving the equipment frequently.
If you find the chassis weight unbearable,
do not attempt to lift the equipment alone.
Lift and move the chassis using the han-
dles on the top panel .
Turn off all power supplies and unplug all
power cables before moving the equip ment.
Completely loosen the thumb/Phillips
screws and pull the card levers to remove
each and all line cards, fan tray, and power
mod ules from the chassis before moving it.
Figure 1. Correctly Moving the DGS-6600 series
chassis switch
Do not move the equipment by
grasping the panels, power supply
handles, or ventilation holes, as
they are not designed to bear
weight.