Trial Operation and Inspection

Before trial operation
• Ensure that the horizontal louver (two pieces) are firmly inserted into the axis on the right and that the clearance on the
right side of the horizontal louver is even.
Inserte the horizontal
louver into the axis on
the right
• Perform the trial operation of the indoor unit before the trial operation of the 3DW Diffusor. For details, refer to the
installation manual of the indoor unit.
• Please control the operation of the horizontal louver and vertical louver by the remote controller, and confirm that the
movement and sound are normal.
* Refer to the manual of the remote controller for operation.
EN-17
Clearance
The clearance on the right
side of the horizontal louver
must be even
Clearance
– 9 –
EN-18