Preparation - Hitachi HT-4139 Installation Manual

Ocr scanner
Table of Contents

Advertisement

5. Installation

5.1 Preparation

Conduct items shown below.
No.
Item
1
Components Check their names and quantity with the attached component list.
2
Cleaning
3
Appearance
Power Supply Required Power (Voltage): 400W(AC100V)・200W(AC200V)
4
5
Input Voltage
Measurement
E
C
H
6
Hopper
Attachment
If the device is contaminated, clean up it with gauze and ethanol.
Ensure there is no scratch, deformation, or discoloration on the device.
Frequency: for both 50/60Hz
:The third-class level grounding is preferable.
Earth
(Need to confirm with customer)
Voltage should be measured at the power outlet.
Voltage between (H)–(C) should be AC90 – AC110V/ AC190 – AC240.
アース工事の確認は特に注意すること。
Pay particular attention to the Grounding
E: Earth, H: Hot line, C: Cold line (depending on countries)
(1) Peel off the tapes from the main unit and the hopper part
(2) Pushing the Main Latch Button, open the Main Cover, and remove the Mirror
Protection Sheet and Support Plate.
Main Latch Button
Top Latch Button
Main Cover
Side Cover
Procedure
Top Cover
Elevator Arm
Hopper Attaching screw
Support
Support
Plate
Plate
-G3-
Rev0 10.03.24
Hopper Attaching Screw
Mirror Protection Sheet
tape
tape
(cont.)

Advertisement

Table of Contents
loading

Table of Contents