2

Installation

2.1

Space Requirements

Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
Space requirements when installing the operator panel:
177 mm
(6.97 inch)
50 mm
(2.0 inch)
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
2.2

Installation Process

1. Unpack and check the delivery. If damage is found, notify the supplier.
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
Mitsubishi Electric, MA00776E
100 mm
(4.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
285 mm
(11.22 inch)
Panel cut out 245.5 x 138.5 mm
x 6
100 mm
(4.0 inch)
56 mm
(2.20 inch)
(9.67 x 5.45 inch)