Mitsubishi Electric E1070 Installation Manual page 9

Hide thumbs Also See for E1070:
Table of Contents

Advertisement

4. Connect the cables in the specified order, according to the drawing and steps
below.
Caution:
The operator panel must be brought to ambient temperature before it is started
up. If condensation forms, ensure that the operator panel is dry before connecting
it to the power outlet.
Ensure that the operator panel and the controller system have the same electrical
grounding (reference voltage level), otherwise errors in communication may
occur.
Ensure that the voltage and polarity of the power source is correct.
Separate high voltage cables from signal and supply cables.
Shielded communication cables are recommended.
B
RS422/RS485
RS232
Ethernet
Connect cable A.
Connect cable B, using an M5 screw and a grounding conductor (as short
as possible), that is sized correctly according to local electrical codes.
Connect cable C.
Connect cable D.
5. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
Mitsubishi Electric, MA00776E
Power
Controller
24V DC
C
D
A
24V DC
Installation
9

Advertisement

Table of Contents
loading

Table of Contents