Location Requirements; Unit Dimensions And Clearances - Haier HLC1700AXS User Manual

Combination front-load washer and ventless dryer designed for high-efficiency; use he detergent
Table of Contents

Advertisement

Available languages

Available languages

LOCATION REQUIREMENTS

• The washer must be installed on a solid floor to minimize vibration during the spin cycle.
• The floor should be level with maximum slope of 1" (25mm) under entire washer.
• A suitable location is protected from direct sunlight and heat sources such as
radiators, baseboard heaters, cooking appliances, etc.
• Do not install on carpeting.
• The location must have a grounded electrical outlet located within 4ft. (1.2m) of
the power cord on the back of the washer.
• Hot and cold water faucets must be present within 3ft. (0.9m) of the hot and cold
connections on the washer.
• A water heater must supply hot water with a temperature of at least 120ºF (49ºC).
• The water pressure should be between 20-100 psi (138-690 kPa).
• This appliance must be operated at room temperature.
• Do not install or operate this appliance in an area where the ambient temperature
can fall below freezing.

UNIT DIMENSIONS AND CLEARANCES

23-7/16"
Front View
Minimum Installation Clearances / Detergent Minimum
Front
Sides and Rear
Top of Control
Front ventilation openings are required for closet installations:
24 square inches-3inches from bottom. 48 square inches-3 inch from top.
Louvered door with equivalent openings is acceptable.
8
33-9/32"
Alcove
n/a
1" (25mm)
1" (25mm)
40-23/32"
22-15/32"
Open
Door 20"
Side View
Closet
1" (25mm)
1" (25mm)
1" (25mm)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hlc1700axw

Table of Contents