Huawei SUN2000-6KTL-L1 Quick Manual page 12

Hide thumbs Also See for SUN2000-6KTL-L1:
Table of Contents

Advertisement

COM Port Pin Definitions
Crimping Two Signal Cables
Crimping Three Signal Cables
No.
Label
Definition
1
RS485B, RS485
485B1
differential signal–
2
RS485A, RS485
485A1
differential signal+
3
RS485B, RS485
485B2
differential signal–
4
RS485A, RS485
485A2
differential signal+
5
GND
GND of the enable
signal/12V/DI1/DI
2
6
EN+
Enable
signal+/12V+
7
DI1
Digital input signal
1+
8
DI2
Digital input signal
2+
11
Description
Solar inverters cascading
scenario: used for connecting
to the solar inverters.
Used for connecting to the
RS485 signal ports of the
battery and power meter.
When both battery and power
meter are configured, they
need be crimped to the 485B2
and 485A2 ports.
Used for connecting to GND of
the enable signal/12V/DI1/DI2.
Used for connecting to the
enable signal of the battery
and the 12V positive signal.
Used for connecting to the DI1
positive signal. It can be used
for connecting to the DRM0
scheduling signal or reserved
for the rapid shutdown signal.
Used for connecting to the DI2
positive signal. It can be
reserved for the feedback
signal of the Backup device.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-2ktl-l1

Table of Contents