3 Rack mounting

Install the recorder in an EIA standard 19-inch rack (Depth:
550 mm or more).
Note:
• Use four M5 × 12 screws (locally procured) to install the
recorder in a rack.
• The illustration on this page is schematic. Details of the
shape are omitted.

Installation procedure

Step 1
Remove the five rubber feet from the bottom of the
recorder using a flathead screwdriver.
Use a screwdriver to remove the screws holding the rubber feet.
Step 2
Attach the rack mount brackets (WV-Q202: option) on
both sides of the recorder.
Secure them using the rack mount bracket fixing screw
(Provided with the rack mount bracket) (×4).
Tightening torque: 0.88 N·m ~ 1.08 N·m {0.65 lbf·ft ~ 0.80 lbf·ft}
Rack mount bracket fixing screws (M4×10 provided with the bracket)
Rack mount brackets (option)
Note:
• The following illustration shows two types of mounting holes
in the rack mount bracket. Please use the holes of A.
B
Remove rubber feet
A
Step 3
Install the recorder in the rack by using four rack
mounting screws.
Secure using the rack mounting screws (×4).
Tightening torque: 2.0 N·m ~ 2.4 N·m {1.48 lbf·ft ~ 1.78 lbf·ft}
Rack mounting screws (M5 × 12, locally procured)
Important:
• When installing the recorder in the rack, make a space
of 1U (44 mm {1-23/32 inches}) above and below the
recorder for ventilation.
• Keep the temperature in the rack below +45 °C {113 °F}.
• It is recommended to install cooling fans or equivalents to
keep the temperature in the rack below +30 °C {86 °F}.
• Do not block the ventilation holes or slots to prevent the
recorder from overheating.
15