Straight Hydraulic Fitting With O-Ring; 90° Hydraulic Fitting With O-Ring; Lift Valve; Valve Plate - Toro Sand Pro 5040 Operator's Manual

Hide thumbs Also See for Sand Pro 5040:
Table of Contents

Advertisement

4
Installing the Lift Valve
Model 08705 Only
Parts needed for this procedure:
2

Straight hydraulic fitting with O-ring

2
90° hydraulic fitting with O-ring
1

Lift valve

1

Valve plate

3
Bolt (1/4 x 3 inches)
3

Locknut (1/4 inch)

2

Bolt (#10 x 1-1/4 inches)

2

Locknut (#10)

1

Lift lever

Procedure
1.
Thread both 90° fittings and the 2 straight
hydraulic fittings into the new lift valve as shown
in
Figure
7.
Important:
Do not tighten the 90° fittings
at this time. Ensure that all O-rings are
lubricated and properly positioned on the
fittings before installation.
1. Straight fitting
2. 90° fitting
2.
Mount the valve assembly, pivot bracket, and
valve plate to the frame with 3 bolts (1/4 x 3
inches) and 3 locknuts
valve plate against the front of the frame member
when mounting, and torque the fasteners to 10
to 12 N∙m (90 to 110 in-lb).
Figure 7
3. Lift valve
(Figure
8). Position the
Note:
The valve installation is very similar to
the existing valve that is already installed.
3.
Loosely mount the pivot lever assembly to the
valve spool and to the offset link with 2 bolts
(#10 x 1-1/4 inch) and 2 locknuts
Note:
Do not tighten the fasteners at this time.
1. Valve assembly
2. Pivot bracket
3. Valve plate
g003663
6
(Figure
Figure 8
4. Offset link
5. Pivot
6. Lever
8).
g003664

Advertisement

Table of Contents
loading

This manual is also suitable for:

Infield pro 504008712

Table of Contents