LG CordZero A91 Series Owner's Manual page 13

Hide thumbs Also See for CordZero A91 Series:
Table of Contents

Advertisement

CAUTION
• Keep fingers away from pinch points when
assembling the appliance or the charging
station.
NOTE
• The charging station can be removed as needed.
To remove it, hold the floor stand dock steady
and pull up on the charging station.
1
Place the floor stand dock on a hard and level
floor and assemble the floor stand pipe.
2
Clip the power cord tidily into the cord keeper
on the back of the floor stand pipe.
a
3
Assemble the charging station onto the top of
the floor stand pipe.
4
Connect the power adapter to the port on the
back of the charging station.
5
Drill a hole in the wall and insert the drywall
anchor
if needed.
b
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
• For drywall anchor: use 1/4" (6.5 mm) drill
bit
• For concrete or wall stud: use 1/8" (3 mm)
drill bit
• If screwing into drywall, use the drywall
anchor.
6
Align the wall anchoring block
charging station, and fix the charging station
to the wall by tightening the anchoring screw
all the way.
d
INSTALLATION
13
of the
c

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents