SUN2000-(100KTL, 110KTL, 115KTL)-M2
User Manual
Figure 5-6 Connecting the PE cable to the PE point (on the enclosure)
(1) Reserved PE point
----End
Follow-up Procedure
To enhance the corrosion resistance of a ground terminal, apply silica gel or paint
on it after connecting the PE cable.
5.4 Opening the Maintenance Compartment Door
Precautions
● Do not open the panel cover of the solar inverter.
● Before opening the maintenance compartment door, ensure that no electrical
● Do not open the maintenance compartment door on rainy or snowy days. If
● Do not leave unused screws in the maintenance compartment.
Procedure
Step 1 Open the maintenance compartment door and install the support bar.
Issue 02 (2022-06-30)
CA UTION
connections are made for the solar inverter on the AC or DC side.
you need to, take protective measures to prevent rain or snow from entering
the maintenance compartment.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
44