Log Book - Panasonic PAW-TD20C1E5-UK Installation Manual

Table of Contents

Advertisement

The code of practice for the installation,
commissioning & servicing of mains pressure hot water storage
Installation,Commissioning
Installation,Commissioning
and Service Record Log Book
and Service Record Log Book
NAME
ADDRESS
1. Please, keep the Log Book in a safe place for future reference.
2. This Log Book is to be completed in full by the competent person(s) who
commissioned the equipment and then handed to the customer. When this is done,
the Log Book is a commissioning certificate that can be accepted as evidence of
compliance with the appropriate Building Regulations.
3. Failure to install and commission this appliance to the manufacturer's
instructions may invalidate the guarantee.
INSTALLER & COMMISSIONING ENGINEER DETAILS
COMPANY NAME
ADDRESS
INSTALLER NAME
REGISTRATION DETAILS
REGISTERED OPERATIVE ID CARD No.
(IF APPLICABLE)
COMMISSIONING ENGINEER (IF DIFFERENT)
NAME
ADDRESS
TEL No.
REGISTRATION DETAILS
REGISTERED OPERATIVE ID CARD No.
(IF APPLICABLE)
IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOGBOOK AND PASS IT
ON TO THE CUSTOMER. FAILURE TO DO SO MAY INVALIDATE THE CYLINDER GUARANTEE
CUSTOMER DETAILS
IMPORTANT
The above does not affect your statutory rights.
INSTALLER DETAILS
TEL No.
DATE
TEL No.
DATE
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Paw-td30c1e5-ukPaw-td30c1e5hi-uk

Table of Contents