Huawei NetCol5000-C065 Quick Manual

Huawei NetCol5000-C065 Quick Manual

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C065:

Advertisement

Quick Links

NetCol5000-C(065, 080) In-row Chilled
Water Smart Cooling Product
Quick Guide
Issue: 05
Date: 2019-06-24
1
Overview
Model
Cooling Capacity
(kW)
Net Weight (kg)
(full configuration)
Dimension (mm)
(H x W x D)
(1) Electric control
(2) PSU
box
(4) Differential
(5) Temperature and
pressure switch
humidity sensor
(7) Water outlet
(8) Chilled water valve
pipe
(11) Condensate pump
(If condensate water
(10) Automatic
needs to be drained by
drainpipe
using a water pump,
you can customize a
condensate pump)
2
Preparing Materials
Materials
Fuse, connect plate 1, connect plate 2, combined hexagon head bolts M12x90, OT
Configured with
ground terminal of the power cable to the indoor unit, and single cord end terminal
the Equipment
of the power cable to the indoor unit
Automatic
drainpipe
Engineering
Procurement
Humidifier
water inlet
pipe
NetCol5000-C065
65
202
2000 x 600 x 1200
Rigid pipe: BSPT 1/2-inch rigid pipe connector with external
threads, and rigid pipe (PP-R or C-PVC)
Hose: BSPT 1/2-inch pagoda connector with external threads,
hose clamp, and hose (inner diameter of 3/4 inch, made of
EPDM)
Rigid pipe: G 1/2-inch rigid pipe connector with external threads,
and rigid pipe (PP-R or C-PVC)
Hose: G 1/2-inch pagoda connector with external threads, hose
clamp, and hose (inner diameter of 3/4 inch, made of EPDM)
Copyright © Huawei Technologies Co., Ltd. 2019 All rights reserved.
NetCol5000-C080
80
240
2500 x 600 x 1200
(3) Main control
board
(6) Wet film
humidifier
(9) Humidifier
pump
(12) Water inlet
pipe
1

Advertisement

Table of Contents
loading

Summary of Contents for Huawei NetCol5000-C065

  • Page 1 NetCol5000-C(065, 080) In-row Chilled Water Smart Cooling Product Quick Guide Issue: 05 Date: 2019-06-24 Copyright © Huawei Technologies Co., Ltd. 2019 All rights reserved. Overview Model NetCol5000-C065 NetCol5000-C080 Cooling Capacity (kW) Net Weight (kg) (full configuration) Dimension (mm) 2000 x 600 x 1200...
  • Page 2 Chilled water Seamless steel pipe with a G 1–1/2 in. external threaded inlet and connector or Aluminum plastic pipe with an inner diameter of 41 outlet pipes Engineering Power cable (as shown in the following table), teamwork networking and monitoring cables, and equipotential cable (≥ 16 Procurement Cables mm²...
  • Page 3: Installing The Equipment

    Discharging Nitrogen Removing Air Filters NOTE There are two air filters for NetCol5000-C065 1. The equipment has been injected with kW and three for NetCol5000-C080 kW. The 0.3–0.5 MPa of nitrogen before delivery. If...
  • Page 4 Leveling the Cabinet Removing the Pallet NOTE The connectors are secured to the equipment with M6 screws and secured to the pallet with M12 screws. Level Installing Cabinets Side by Side Securing the Equipment Front door Rear door...
  • Page 5 Installing Pipes Pipe Layout 1. A 1:100 tilt should be reserved for the main drainpipe. 2. Keep a clearance of at least 25 mm between pipes. Secure the pipes to supports every a certain distance. 3. Clean the water inlet engineering pipes to avoid impurities entering into the humidifier. 4.
  • Page 6 Connecting the Humidifier Water Inlet Pipe Connection method (1) Reserved connector (4) Pagoda connector (2) Rigid pipe adapter (5) Hose clamp (3) Rigid pipe (6) Hose Connecting the Chilled Water Inlet and Outlet Pipes Aluminum plastic pipe (1) Reserved device port (2) Direct connection of external teeth (3) Sealing ring...
  • Page 7: Installing Cables

    Injecting Water to Expel Nitrogen Clean the main pipe beforehand to avoid blockage of the heat exchanger due to foreign construction matter. Close the isolation valve on the water inlet and outlet pipes before the cleaning. 1. Open the general water supply valve. 2.
  • Page 8 1. Connect the equipotential cable. 2. Connect the power cable. Connecting the Water (Optional) Installing a Differential Pressure Sensor Sensor Connect the cable terminal of the micro differential pressure sensor to the DPT terminal. Cold aisle Connect a pressure inlet tube to the + mark and route it to the aisle through the hole on the top of the cabinet.
  • Page 9 (Optional) Installing T/H Sensors Outside Cabinets 1. Connect the temperature and humidity (T/H) sensor cable (W12). The T/H sensors inside the cabinet are secured at the return air side and their IN ports are connected to the main control board. When connecting the T/H sensors outside the cabinet, connect the OUT port of one T/H sensor inside the cabinet to the IN port of the next T/H sensor outside the...
  • Page 10 CAN teamwork network cable (Optional) Connecting the Monitoring Network Cable The smart cooling product supports both RS485 monitoring and FE monitoring. Connecting the FE monitoring cable (SNMP/Modbus-TCP protocol) The FE monitoring and FE teamwork use the same network cable. Connect the FE monitoring cable in the same process of connecting the FE teamwork network cable.
  • Page 11: Verifying The Installation

    Verifying the Installation No. Check Item Check Result All water pipes are properly and securely installed, and free from leakage, □ Passed □ Failed blockage, and sharp turns. The liquid level detector is level. The water pan is free from foreign matter □...
  • Page 12 (Optional) Setting the Indoor Fan Control Type If a micro differential pressure sensor is installed and the pressure difference control is required, set Air-side difference pressure sensor type to 0–50 Pa, and set the Indoor fan control type to Pressure diff ctrl. It is recommended that the Indoor fan pressure difference setpoint retain the default value.
  • Page 13 Startup and Wizard Startup • Download the Service Expert app from Huawei app store and runs on Android. Apply for permission after downloading the app. • Except that the indoor fan item is mandatory, you can clear other commissioning items that are not required.
  • Page 14: Routine Maintenance

    To prevent glycol solution from corroding pipes and the heat exchanging coil, corrosion inhibitor should be mixed into the glycol solution. For details about the mixing schemes, consult glycol experts. Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...

This manual is also suitable for:

Netcol5000-c080

Table of Contents