29

3. Installation Flow

The following shows the job flow for installing the BBU. For details, see the respective
chapters.
Check BBU and accessories.
Check notes on installation.
Check connections and
set write cache mode.
Start
Install BBU.
End
Chapter 1
Describes how to check the BBU and
accessories in the package and the
notes on installation.
Chapter 2
1. Installation Procedure
Describes how to install the BBU.
Chapter 2
2. Check from Utility
Describes connection checking
procedure after battery installation and
the setting of the write cache mode.