Haier GE APPLIANCES NF96US Service Manual page 16

96 upflow/horizontal single stage constant torque motor gas furnace
Hide thumbs Also See for GE APPLIANCES NF96US:
Table of Contents

Advertisement

Red and
Black
or Red Tubing
(negative -)
To Cold End Header Box
1 - Remove thermostat demand and allow unit to
cycle off.
2 - Install a tee in the negative (-) line (red and black tubing
or red tubing) and a tee in the positive (+) line (black
tubing) running from the pressure switch to the cold
end header box.
3 - Install a manometer with hose from the negative (-)
side of the manometer to the tee installed in the
negative (-) line and with hose from the positive (+)
side of the manometer to the tee in the positive (+)
line.
NOTE -
tive. However the (+) port reads less negative pressure
than the (-) port.
Tubing
Field Provided Tubing
To Pressure Switch
Figure 11. Measuring Pressure Differential
Page 16
"+"
High
"-"
Low
4 - Operate unit and observe manometer reading.
Readings will change as heat exchanger warms.
a. Take one reading immediately after start up.
b. Take a second reading after unit has reached
steady state (approximately 5 minutes). This will be
the pressure differential.
The pressure differential should be greater
than those listed in table 7.
5 - Remove thermostat demand and allow to cycle off.
6 - Remove manometer and tee's. Reinstall combustion
air sensing hoses to the pressure switch.
Black Tubing
(positive +)
To Cold End Header Box
31-5000728 Rev. 0