Installation, wiring, commissioning, operation, disassembly
3.4 Connecting and commissioning
3.4
Connecting and commissioning
Open equipment
The devices are "open equipment" acc. to the standard IEC 61010-2-201 or UL 61010-2-201
/ CSA C22.2 No. 61010-2-201. To fulfill requirements for safe operation with regard to
mechanical stability, flame retardation, stability, and protection against contact, the
following alternative types of installation are specified:
• Installation in a suitable cabinet.
• Installation in a suitable enclosure.
• Installation in a suitably equipped, enclosed control room.
Power supply
The device is designed for operation with a directly connectable safety extra low voltage
(SELV) from a limited power source (LPS).
The power supply therefore needs to meet at least one of the following conditions:
• Only safety extra low voltage (SELV) with limited power source (LPS) complying with IEC
If the equipment is connected to a redundant power supply (two separate power supplies),
both must meet these requirements.
Connector
Read the system manual "S7-1500 Automation System"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1500 Automation System", see Documentation (Page 9), Documentation
guide.
Power supply off
Make sure that the power supply is turned off when connecting the devices.
26
WARNING
WARNING
60950-1 / EN 60950-1 / VDE 0805-1 or IEC 62368-1 / EN 62368-1 / VDE 62368-1 may be
connected to the power supply terminals.
WARNING
Equipment Manual, 01/2023, C79000-G8976-C326-05
SIMATIC CP 1542-5