Product Dimensions; Advance Planning - Haier GE UVC9420 Installation Instructions Manual

Custom insert hood
Table of Contents

Advertisement

PRODUCT DIMENSIONS

Design varies by model

ADVANCE PLANNING

Duct Install Planning
the ceiling. Use a 10" round duct. Use locally
supplied elbows to vent horizontally through the rear
wall.
Plan the route for venting exhaust to the outdoors.
To maximize the ventilation performance of the vent
system:
1. Minimize the duct run length and number of
transitions and elbows.
2. Maintain a constant duct size.
3. Seal all joints with duct tape to prevent any leaks.
NOTE: Flexible vent is not recommended. Flexible
vent creates back pressure and air turbulence that
greatly reduces performance.
foot for vent hoods.
exterior opening. Purchase the wall or roof cap and
any transition and length of duct needed in advance.
10
Installation Preparation
7 5/8"
A"
Model
A
UVC9420 39-1/2"
UVC9480 45-3/4"
Vent system can terminate either through the roof
needed and installed immediately above the hood.
Add Insulation
and/or Caulk
Cabinet
Add tape to joint
Hood
Wall and Ceiling Framing for Adequate Support
This vent hood is heavy and the cabinet structure
needs to support the weight of the loaded insert
sleeve. Adequate structural support must be
provided in all types of installations.
installed before the cooktop.
28 7/16"
15"
12 1/2"
21 7/8"
Roof Cap
Round Duct
Wall Cap
Add Insulation
and/or Caulk
49-2000930 Rev. 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge uvc9480

Table of Contents