Parts Provided; Plan The Installation; Remove The Packaging - Haier GE UVC9420 Installation Instructions Manual

Custom insert hood
Table of Contents

Advertisement

TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)
Pencil and tape measure
Level
Tin snips
Wire cutter/

PARTS PROVIDED

Locate the parts packed with the hood.
NOTE: The hardware bag may contain extra pieces
to accommodate a variety of installation methods for
various models.
Hardware Bag
B
Philips Head
Phillips Head
Machine Screw
Wood Screws
1/8" X 3/8"
1/8" X 1/2"
(QTY: 8)
Side Panel
UVC9480 only (QTY: 2)
14
Installation Preparation
Aluminized
duct tape
Flashlight
UL listed wire nuts
stripper
Hood
D
L
Phillips Head
Wood Screws
3/16" x 1" (QTY: 8)
(QTY: 2)
Remote Control
(QTY: 1)
Damper
Assembly
Needle-nose pliers
Step ladder
Safety glasses
Phillips and flat-blade
screwdrivers

PLAN THE INSTALLATION

properly exhaust air, be sure to duct the air
outside – Do not vent exhaust air into spaces
within walls or ceilings or into attics, crawl
spaces, or garages.
PERSONAL INJURY HAZARD
It is recommended that 2 people are used to
install the range hood. Failure to properly
lift rangehood could result in damage to the
product or personal injury.

REMOVE THE PACKAGING

sharp edges.
Remove the hardware bag, literature package
and other boxed parts.
Remove and properly discard the protective
plastic wrapping and other packaging materials.
Consider recycling options for your appliance
packaging material.
Electric drill and
appropriate bits
10" ducting and
caps as needed
Strain relief for
junction box
To reduce risk of fire and to
Wear gloves to protect against
Gloves
49-2000930 Rev. 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge uvc9480

Table of Contents