LG Split DOAS Set Up Reference Guide
This guide is provided to assist in the proper field configuration of this product.
TM
Multi V 5
System Setting
: Multi V 5 system automatically detects the DOAS system without 'Auto Addressing'
Check the SW version of MV 5 system, which is connected to DOAS system
Note : CH200 will occur if you proceed auto addressing, CH200 can be cleared when user
does a 'Factory Reset' of HR PCB in DOAS unit.
‐. LG Split Rooftop DOAS : ARND30UBE4 requires latest
MV 5 SW Version : v.1.47.0 (Check Sum: 4693) – Production date(Mar.'22)
‐. LG Split Compact DOAS : ARND153DCR4, ARND203DCR4 requires latest
MV 5 SW Version : v.1.49.0 (Check Sum: 2291) – Production date(May.'22)
Do not use
the following functions of Multi V 5, which could interrupt proper Target Pressure 
control of DOAS
‐. FN7 (Adjusting Indoor unit Capacity by airflow)
‐. FN8 (Adjusting Target Pressure)
‐. FN14 (Smart Load Control)
‐. FN30 (High Sensible Operation) 
‐. SE14 (Level Change of Error Code CH200) 
‐. ID5 (Auto Addressing_method selection)
‐. ID6 (Auto Addressing Start)
: Based on the DOAS Fan control Setting in ODU Defrost mode at DOAS Controller(Web UI),
FN27 will not activate
DOAS System Setting
: DOAS Setting can be done with Keypad and Web UI by connecting Ethernet port to Laptop     
Web UI configuration is recommended to set and operate the DOAS unit
* Web UI
: The appearance of DOAS Controller is same as AHU Comm.kit. However, since 
completely different software is loaded, do not try to implement the functions in 
AHU Comm.kit with DOAS Main module.
 Don't change any Dip SW Setting on Main Module
: All the DOAS Control Logic is embedded in this Main Module, and it transfers the data 
to CAREL Controller to offer WEB User Interface and easy configuration.
: During the unit's operation, Red dots will cycle on 7‐Seg display.
It is normal operation condition.
This guide is provided as reference material. Please follow the instructions in the applicable manual(s) to prevent product malfunction, 
property damage, injury, or death to the user or other people. Incorrect operation due to ignoring any instructions will cause harm or damage. 
For continual development, LG Electronics U.S.A., Inc. reserves the right to change specifications without notice. 
*DOAS unit includes HR box inside of the unit
* Main Module

Advertisement

loading

Summary of Contents for LG Multi V 5

  • Page 1 LG Split DOAS Set Up Reference Guide This guide is provided to assist in the proper field configuration of this product. Multi V 5 System Setting : Multi V 5 system automatically detects the DOAS system without ‘Auto Addressing’ Check the SW version of MV 5 system, which is connected to DOAS system Note : CH200 will occur if you proceed auto addressing, CH200 can be cleared when user does a ‘Factory Reset’ of HR PCB in DOAS unit. ‐. LG Split Rooftop DOAS : ARND30UBE4 requires latest MV 5 SW Version : v.1.47.0 (Check Sum: 4693) – Production date(Mar.’22) ‐. LG Split Compact DOAS : ARND153DCR4, ARND203DCR4 requires latest MV 5 SW Version : v.1.49.0 (Check Sum: 2291) – Production date(May.’22) :  Do not use the following functions of Multi V 5, which could interrupt proper Target Pressure  control of DOAS ‐. FN7 (Adjusting Indoor unit Capacity by airflow) ‐. FN8 (Adjusting Target Pressure) ‐. FN14 (Smart Load Control) ‐. FN30 (High Sensible Operation)  ‐. SE14 (Level Change of Error Code CH200)  *DOAS unit includes HR box inside of the unit ‐. ID5 (Auto Addressing_method selection) ‐. ID6 (Auto Addressing Start) : Based on the DOAS Fan control Setting in ODU Defrost mode at DOAS Controller(Web UI), FN27 will not activate DOAS System Setting : DOAS Setting can be done with Keypad and Web UI by connecting Ethernet port to Laptop      Web UI configuration is recommended to set and operate the DOAS unit * Main Module * Web UI : The appearance of DOAS Controller is same as AHU Comm.kit. However, since  completely different software is loaded, do not try to implement the functions in  AHU Comm.kit with DOAS Main module.  Don’t change any Dip SW Setting on Main Module : All the DOAS Control Logic is embedded in this Main Module, and it transfers the data ...
  • Page 2 LG Split DOAS Set Up Reference Guide LG Split Rooftop DOAS LG Split Compact DOAS party Sensor : Be Sure to Set ‘Installed’ at the Configuration on ‘Web UI’ if user needs to use 3 party sensor. If not, DOAS will not detect 3 party sensor value (e.g Space Temperature, Humidity, CO , etc.) : If two different types of sensors are installed, unit will control and monitor the value on WEB UI       ‐. Space Air Temperature sensor Priority : NTC Type > 0~10V Type ‐. Supply Air Temperature Sensor Priority : 0~10V Type > NTC Type  DOAS will be controlled and monitored(Web UI) with Higher Priority value ...
  • Page 3 LG Split DOAS Set Up Reference  Guide DOAS Operation Following installation, DOAS configuration and testing includes the process  identified below. 1. Connect the Ethernet line to CAREL Controller and Laptop 2. Check IP Address on CAREL*, copy it to Chrome Browser in your Laptop *Click Menu button on CAREL controller [      ]  Ctrl. Variable  Network  Check IP address 3. Login with ‘Service manager’ account for configuration (PW:7600) 4. Unit Parts Check (Service  Test Run)  ‐. Rooftop DOAS : Dampers(OA/EA/MA)  Fans(SA/EA)  Wheel  Coils(Main/Reheat/Recovery) ‐. Compact DOAS : SA Fan  Main Coil#1  Reheat Coil During Test Run unit automatically check the parts fault by its input/output signal(feedback) Test Run 5. Check the Simple Unit Operation (Supply Air Control)  ‐. Cooling : If ‘OA + Heat Cool Deadband /2’ Temp. is higher then Target Temperature Unit will be in Cooling ‐. Heating : If ‘OA – Heat Cool Deadband /2’ Temp. is lower then Target Temperature, Unit will be in Heating There are two ways to ensure proper performance under certain operating mode(s). 1) Change your Target temperature so  that unit can change the mode. 2) Use ‘Manual Override’ to change Outside Air Condition on Web UI. OA temperature can be manually overridden in order to enter Cooling or Heating Mode. [Manual Override] Target Temp. Set OA Temp : 62F Unit goes on  ‘Heating’ mode OA Temp change to : 62F Configuration Manual Override Test Run...
  • Page 4 LG Split DOAS Set Up Reference Guide DOAS Operation Following installation, DOAS configuration and testing includes the process  identified below. 5. Check the Simple Unit Operation (Supply Air Control)  ‐. Dehumidification : Default Setting of Activating Dehumidification mode is based on OA Dew Point. Dew point is calculated by OA Temp and OA Humidity. When OA temp is greater than dewpoint set point(e.g 60F), unit enters dehumidification mode. In dehumidification mode, there is a separate target temperature, which is Main Coil Temperature. Unit will cool down to Cooling Coil temperature and then reheat to the Target temperature, under  Cooling/Heating Target Temperature.                                       If OA dew point is over (e.g 60F) Dehumidification mode is activated Dew Point : 60F 3. Reheat to 72F by Hot gas reheat Coil DOAS Unit operates to cool down  by 55F by Main Coil for dehumidification ‐. Additionally, check whether the unit enters the Dehumidification mode properly with the Manual Override function. If the OA dew point is set as 60F for activating dehumidification mode, OA dewpoint should be higher in order  to enter dehumidification mode. There is no way to set dewpoint directly on manual override, please refer to the ‘Dewpoint Calculator’ on the Support Menu on Web UI. There, the adjustment of the Temp. and Humidity will set up  dewpoint. ‐. While adjusting the temperature and humidity  values, check whether the dew point is higher  than the value we set in the Web UI, and if it is,  put the temperature and humidity values     i n  Temperature Manual override and check that the unit enters dehumidification mode. Relative Humidity Support Dewpoint NOTE: To Control the Unit base on Space Humidity or enthalpy for dehumidification mode, a 3...
  • Page 5 LG Split DOAS Set Up Reference Guide DOAS Operation Following installation, DOAS Configuration and testing includes the process  identified below. 6. LGMV data DOAS and ODU status can be monitored by both Web UI and LGMV DOAS Unit status is shown at IDU info. Rooftop DOAS Compact DOAS ‐ IDU1 : Main Coil #1 ‐ IDU1 : Main Coil ‐ IDU2 : Reheat Coil  ‐ IDU2 : Reheat Coil ‐ IDU3 : Recovery Coil ‐ IDU4 : Main Coil #2 [Cooling / Dehumidification] [Heating] DOAS Unit sets its first target based on  OA Temperature Condition. The Unit will then periodically change its target Pressure based on the difference between its target Temperature and current Supply Temperature.  Default Control Cycle is 180sec and every 180sec DOAS unit sends a Target Pressure based on the Target and  Current Temperature difference.
  • Page 6 LG Split DOAS Set Up Reference Guide On Boarding Process The software’s version can be found on your Web UI and CAREL controller. The  latest version of DOAS SW Firmware is (May ’22); ‐. CAREL :1.1.0.3 ‐. Main Module : 1.4 How to upgrade the SW? ‐. CAREL (via USB) 1. Save the latest CAREL firmware in a folder created with the name ‘UPGRADE’  in the USB * Firmware : LGDOAS_Carel_App_ver_1.1.0.3.ap1 2. Connect CAREL and USB  * Micro USB Male to USB Female OTG adapter is required. apple C‐type USB  To CAREL Camera 5pin 3. Press both buttons at the same time(3sec) 4. Go to ‘Upgrade’ (↑or ↓) than Press (    ) 5. Check the firmware and confirm (    ) Update takes around 10 minutes.  ‐. CAREL (via FTP)  *CAREL Controller and PC(Laptop) should be connected with an Ethernet line https://filezilla-project.org/) on your laptop 1. Download FTP program ( 2. launch ‘Filezilla’  Click ‘Site manager’ Icon (         ) 3. Click ‘New Site’  Input Host IP address(same as CAREL) Click ‘ Connect’ 4. Drag and Drop the firmware from PC to ‘UPGRADE’ folder in CAREL  ①...
  • Page 7 LG Split DOAS Set Up Reference Guide On Boarding Process ‐. Main Module (via LGMV) 1. Activate the program(RFPGUI) on your PC(Laptop) 2. Go to ‘Config’  ‘Select Device’ 3. Select ‘RX210_Series’  Click Device ‘R5F5210AB’  Click ‘OK’  4. Go to ‘Config’  ‘Select UART’ 5. Select compatible UART Port  Click ‘config’ 6. Select 38400 at ‘Byte/sec’ Category  Click ‘OK’ * Recommend communication speed is below 38400 7. Click ‘Code Flash’  Select Firmware  (e.g [DOAS] Main_SAA39108423_1D9D_0xD0F870DE_MP1_20211113) 8. Click ‘Start’  Check ‘OK’ is appeared after upgrade ‐. Hardware Setting 1. Dip SW #1  On 2. Connect LGMV and CN_UART 3. After Finishing Onboarding, disconnect LGMV and set back DIP SW #1  Off...
  • Page 8 LG Split DOAS Set Up Reference Guide Procedure after upgrading CAREL software  After a Firmware update user needs to refresh the Chrome Browser cache. Otherwise, there is no change or blanked screen will pop up on your Web UI  ② More tools  ③ Developer tools  ① Click the Button   ④ Click the Button for 3 Seconds         ⑤ Empty Cache and Hard Reload ① ② ③ ④ ⑤...
  • Page 9 LG Split DOAS Set Up Reference Guide How to reset the HR PCB in DOAS Power Off of DOAS unit Set 8‐Pin Dip switch On (4, 5, 6) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Push 2 buttons simultaneously for more than 1 second.  7 segment display shows whether the HR PCB Reset is a success or not. ‐. Succeed : 7 Segment display ‘rE’ ‐. Fail : 7 Segment display ‘Er’ After HR PCB reset is succeeded, turn back the dip switch setting.  Power on of DOAS unit.