Download Print this page
ABB ED83368-30 Quick Start Manual
ABB ED83368-30 Quick Start Manual

ABB ED83368-30 Quick Start Manual

Micro-bdcbb dc battery distribution circuit breaker bay 600 a, −48v / +24v, 19” or 23”

Advertisement

Quick Links

QUICK START GUIDE
Micro-BDCBB DC Battery Distribution Circuit
Breaker Bay ED83368-30
600 A, −48V / +24V, 19" or 23"
19"
14
19"
14
19"
14
23"
22
23"
22
Notes:
1. Group 1 – Field conversion to Dual buses is not supported.
1 Shunts, when provided, are two 600A shunts, one on each side - A Bus (left) and B bus (right). The VIM1 meter sums the two shunts for one battery bus
configurations.
Page 1
© 2021 ABB. All rights reserved.
1 or 2
1 or 2
2
2
2
1
-
1 or 2
2
2
1 or 2
1
Micro-BDCBB_QSG
1
VIM1
1
VIM1
1
VIM1
108992070
3
CC109145455
4
CC109145447
8
108991056
1
CC109145463
2
Rev. 04

Advertisement

loading

Summary of Contents for ABB ED83368-30

  • Page 1 1 Shunts, when provided, are two 600A shunts, one on each side - A Bus (left) and B bus (right). The VIM1 meter sums the two shunts for one battery bus configurations. Page 1 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 2 QUICK START GUIDE Front Panel Screw Alarm LED Figure 1 Group 1 23" Panel with 477D Alarm Card Figure 2 Group 8 19” Panel with VIM1 Meter Page 2 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 3 QUICK START GUIDE Figure 3 Wall Mounting Bracket CC848786401 Figure 4 Accessory Items Page 3 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 4: Installation Notes

    For Shunt 2, the shunt pair is BL and BL/W. Cut this pair in the vicinity of J1 at the VIM1 meter and butt-splice BL to BL/W and BL/W to BL to reverse the input signal polarity. Page 4 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 5 Position the jumper on HDR1 for Open on Alarm or Close on Alarm. Alarm Jumper HDR1 J2 & J3 Alarm Out Close on Alarm Open on Alarm Figure 6 Alarm Card Page 5 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 6 Install multi-pole bus kits included with each protector and protector holder occupying 2 or 3 positions. Load Connections - Figure 7 Connect breaker load wires to Breaker Load Connections. Connect breaker load return wires to the Return Bus. Page 6 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 7: Alarm Wiring

    2 NO signals Open on Alarm. NC signals Close on Alarm. 3 C signals, such as “Fuse C” are common or return signals for the similarly named signals, such as “Fuse NO”. Page 7 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 8 Breaker/Fuse Generates an alarm when either a circuit breaker trips or a fuse blows. Network Connectivity There are two RJ45 type connectors on the board for future use. Page 8 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 9 The VIM1 front panel is structured such there are three main menu items: System Parameters, Load Parameters, and Control/Operations. Each key menu item has sub items as shown in the menu map below. Page 9 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 10: Programming The Meter

    This Power Loss voltage threshold is configurable between 40.00- Load Power Loss 60.00V for 48V systems and 20.00-30.00V for 24V systems. Factory defaults for these thresholds are 40.00V and 20.00V, respectively. Page 10 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 11 ABB Galaxy Pulsar Plus or Galaxy Millennium 2 system controller through a cat-5 style communication cable. These two system controllers can be part of a standard DC system where the controller is managing ABB rectifiers or in a Standalone monitoring arrangement where there are no ABB system rectifiers but only ED83368 distribution panels with VIM1s.
  • Page 12 • For systems where there are no ABB rectifiers and/or a ABB controller is dedicated to operate as a “Standalone” distribution monitor that is connected only to the system VIM1s set the jumpers to position 2/3 on J10 and J11.
  • Page 13 RS485 bus termination resistor 450050642 installed in the unused RS485 port. In power systems with ABB rectifiers managed by a system controller, the communication connection may not be directly to the controller and will have the be looked at on a per systems basis.
  • Page 14 QUICK START GUIDE Page 14 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 15 QUICK START GUIDE * Maximum of 3 125A fuses per side. A space must be left between each fuse. Page 15 © 2021 ABB. All rights reserved. Micro-BDCBB_QSG Rev. 04...
  • Page 16 – in whole or in parts – is to purchase orders, the agreed particulars shall prevail. forbidden without prior written consent of ABB. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this Copyright©...