INSTALLATION
12
Details to consider when installing the base
A
50
B
E
86.5
B
150
Apply 3/1000 of slope
Precaution when moving the forklift
* The side with the control box is the front side.
Water pipe connection
Water pipe construction is a very important part of the design or construction of the cooling
system. Any defect in any location of the pipe can disable the applicable unit from performing
sufficiently. Perform the design and construction considering the check service.
* Location of anchor bolt
Classification
1 UNIT
A
977
B
877
C
2 300
D
2 200
E
804
F
1 769
Drain
hole
2 UNIT
3 UNIT
1 740
2 503
1 640
2 403
2 300
2 300
2 200
2 200
1 569
2 330
1 769
1 769