Siemens SIMATIC NET S7-CPs Manual

For industrial ethernet
Hide thumbs Also See for SIMATIC NET S7-CPs:

Advertisement

Quick Links

SIMATIC NET
S7-CPs for Industrial Ethernet
Manual Part B
CP 343-1 Lean
6GK7 343−1CX10−0XE0
for SIMATIC S7−300 / C7−300
LEDs
Release 09/2009
C79000-G8976-C198-06
as of hardware version 2, as of firmware version V2.2
TP port:
2 x 8-pin RJ-45 jack
(beneath the front panel)
X = Placeholder for hardware
version

Advertisement

Table of Contents
loading

Summary of Contents for Siemens SIMATIC NET S7-CPs

  • Page 1 SIMATIC NET S7-CPs for Industrial Ethernet Manual Part B CP 343-1 Lean 6GK7 343−1CX10−0XE0 as of hardware version 2, as of firmware version V2.2 for SIMATIC S7−300 / C7−300 LEDs TP port: 2 x 8-pin RJ-45 jack (beneath the front panel) X = Placeholder for hardware version Release 09/2009...
  • Page 2: Notes On The Product

    Notes on the product Notes on the product Product names This description contains information on the following product S CP 343−1 Lean Order number 6GK7 343−1CX10−0XE0 as of hardware version 2 and firmware version V2.2 for SIMATIC S7−300 / C7−300 Note In this document, the term CP is used instead of the full product name.
  • Page 3 S7 CPs for Industrial Ethernet. Part A of the manual release 05/2008 and this Part B belong together You can download the general Part from the Internet: http://support.automation.siemens.com/WW/view/en/30374198 Contents − Part B 1 Properties / Services .
  • Page 4 Contents 5.4.3 Effects of multicast communication on RT communication ..B−26 Characteristic data of the integrated switch ..... . B−27 6 The CP as Web server .
  • Page 5: Properties / Services

    1 Properties / Services 1 Properties / Services Application The CP 343-1 Lean communications processor is intended for operation in a SIMATIC S7-300 or SIMATIC C7 automation system. It allows attachment of the S7-300 to Industrial Ethernet and supports PROFINET IO. To integrate the CP in a linear bus or ring, to connect a further Ethernet device or to use PROFINET media redundancy, a 2-port real time ERTEC switch with autocrossing, autonegotiation and autosensing was integrated in the CP.
  • Page 6: Other Services

    1 Properties / Services − LOCK/UNLOCK with FETCH/WRITE services; − Connection diagnostics using the user program Other services Within an Ethernet network with a ring topology, the CP supports the media redundancy protocol MRP. You can assign the role of redundancy client to the CP.
  • Page 7 1 Properties / Services As an alternative to STEP 7, you have the option of assigning the connection configuration via a block interface in the user program (FB55: IP_CONFIG). S Web diagnostics With the aid of Web diagnostics, you can read out the diagnostic data from a station connected via the CP to a PG/PC with an Internet browser.
  • Page 8: Requirements For Use

    2 Requirements for Use 2 Requirements for Use Operation in controller device families The CP can be operated in the following device families: S S7-300 stations with the CPU types − Standard − Compact − Modular S C7 control systems in C7 packaging system The following tables show the devices with which the CP can be operated with this range of functions: Notice...
  • Page 9 2 Requirements for Use Table 2-1 Use of the CP with S7-300 Order number CPU 314 IFM 6ES7 314−5AE03−0AB0 6ES7 314−5AE10−0AB0 CPU 314C-2 DP 6ES7 314−6CF02−0AB0 6ES7 314−6CG03−0AB0 CPU 314C-2 PtP 6ES7 314−6BF01−0AB0 6ES7 314−6BF02−0AB0 6ES7 314−6BG03−0AB0 CPU 315 6ES7 315-1AF03-0AB0 CPU 315−2 DP 6ES7 315−2AF03−0AB0 6ES7 315−2AG10−0AB0...
  • Page 10 2 Requirements for Use Table 2-2 Use of the CP in C7 control systems Order number C7−613 6ES7 613−1CA01−0AE03 6ES7 613−1CA02−0AE3 C7−633 DP 6ES7 633−2BF02−0AE03 C7−635 Keys 6ES7 635−2EC01−0AE3 6ES7 635−2EC02−0AE3 C7−635 Touch 6ES7 635−2EB01−0AE03 6ES7 635−2EB02−0AE3 C7−636 Keys 6ES7 636−2EC00−0AE03 6ES7 636−2EC00−0AE3 C7−636 Touch 6ES7 636−2EB00−0AE3...
  • Page 11 Installation of the Hardware Support Package (HSP) You will find the HSP on the Internet at the following address: www.siemens.com/automation/step7−hwconfig2 Install the HSP in STEP 7 / HW Config in the “Options” menu with the “Install Hardware Updates” menu command. You will find further information in the STEP 7 online help (under “HSP”...
  • Page 12 You will find information on the latest block version and links to download the current blocks in our Customer Support area on the Internet: http://support.automation.siemens.com/WW/news/en/8797900 With the older module types, this recommendation assumes that you are using the latest firmware for the particular block type.
  • Page 13: Installation And Commissioning

    3 Installation and Commissioning 3 Installation and Commissioning Procedure / steps Step Explanation / meaning 1. Install the CP on the S7 standard rail. Slots 4 to 11 are permitted for the CP in racks 0 to 3 (connected by IM 360/361). 2.
  • Page 14 3 Installation and Commissioning Step Explanation / meaning 6. Use the diagnostic functions during The following options are available: commissioning and to analyze problems. The LED displays on the CP Hardware diagnostics and troubleshooting with STEP 7 Communication diagnostics with STEP 7 / NCM Diagnostics Standard information using HW Config Web diagnostics...
  • Page 15 3 Installation and Commissioning S Slider pulled out: No connection between chassis and reference ground. When shipped: Slider pushed in Use a screwdriver to set the slider. Note An Ethernet cable can also be inserted and removed with the power supply on. Note The hinged front panel must be kept closed during operation.
  • Page 16 3 Installation and Commissioning Module replacement without PG General procedure The configuration data for the CP is stored either on the CPU or on the CP. If the data is stored on the CPU, the module can be replaced with a module of the same type (identical order number) without a PG.
  • Page 17 3 Installation and Commissioning Controlling the operating mode You have the option of changing the mode of the CP between RUN and STOP using the STEP 7 / NCM S7 configuration software (PLC > Accessible Nodes). Procedure S Switch from STOP to RUN: The CP reads the configured and/or downloaded data into the work memory and then changes to the RUN mode.
  • Page 18: Led Displays

    4 LED Displays 4 LED Displays The display on the front panel consists of 8 LEDs that indicate the operating mode and the communication status. Front panel: DC5V RX/TX X1P1 X1P2 STOP MAINT The LEDs have the following meaning: S SF: Group error S BF: Bus fault PROFINET IO...
  • Page 19 4 LED Displays LEDs for displaying the mode The different combinations of the LEDs on the front panel indicate the status: SF (red) BF (red) STOP CP Operating Mode (green) (yellow) Starting up after power “ON” Stopped (STOP) with errors −...
  • Page 20 4 LED Displays The “MAINT” LED Notice When the “MAINT” LED lights up, important error messages and/or diagnostic interrupts have occurred. The CP continues in RUN mode. Check the entries in the diagnostic buffer of the device. Firmware download − LED display patterns The LED display patterns when downloading the firmware are described in Chapter 9.

This manual is also suitable for:

Simatic net cp 343-1 lean

Table of Contents