Siemens SITRANS LG260 Operating Instructions Manual page 53

Guided wave radar
Hide thumbs Also See for SITRANS LG260:
Table of Contents

Advertisement

Shorten cable/rod
PBD-51041061
Caution:
Make sure that the two components of the double washer remain
together.
4. Screw the new rod and the new cable manually to the thread on
the process fitting.
5. Exert counterforce with the second fork spanner and tighten
the measuring rod or cable on the flat surfaces with a torque of
20 Nm (15 lbf ft).
Fig. 21: Exchange cable or rod
Information:
Please maintain the specified torque so that the max. tensile strength
of the connection remains.
6. Enter new probe length and if necessary the new probe type and
then carry out a fresh adjustment (see "Setup procedure, Carry-
ing out min. adjustment - Carrying out max. adjustment").
The rod or cable of the probe can be shortened individually.
1. Mark the requested length with mounted measuring rod.
2. Cable: Loosen the three pins on the gravity weight
Cable ø 4: hexagon 3
Cable ø 6, cable ø 8: hexagon 4
3. Cable: remove the pins
4. Cable: Pull the cable out of the gravity weight
5. Shorten the cable/rod with a cut-off wheel or metal saw at the
marking. Take note of the specifications in the following illustration
when shortening the cable.
6. Cable: shift the cable into the gravity weight (according to the
drawing)
Plastic coated cable: remove coating according drawing to 70 mm
(2.76 in).
SITRANS LG260 - Operating Instructions
53

Advertisement

Table of Contents
loading

Table of Contents