Install In The Rack Position; Install In The Tower Position - ABB RT G2 5-10 kVA UL User Manual

External battery module
Table of Contents

Advertisement

E X T E R N A L B AT T E R Y M O D U L E F O R R T G 2 5 - 1 0 K VA U L
4 4 1

Install in the rack position

Step 1: Install mounting ears to the side mounting holes of the EBM using the screws
4.4.1-1
provided, mounting ears should face forward. Please refer to the below diagram.
Step 1
4.4.1-2
Step 2
4.4.1-1
Step 2: Lift the EBM and slide it into the rack enclosure. Install the EBM to the rack with
screws, nuts through its mounting ears and into the rack rails. Please refer to the below
diagram
4.4.1-2

4 4 2 Install in the tower position

Step 1: Prepare the tower feet (UPS accessary) and extension feet, the extension feet
4.4.2-1
depend on your system configuration. (Tower feet=2U, long extension=2U, short
Step 1
extension=1U). Please refer to the below diagram.
4.4.2-2
Step 2
4.4.2-1
Step 2: Place EMBS (optional), UPS, EBM, and ISO TX (optional) on tower feet assembly.
Please refer to the below diagram.
4.4.2-2
STATUS:
Approved
© Copyright 2022 ABB. All rights reserved.
SECURITY LEVEL:
Public
DOCUMENT ID:
4NWD005661
REV:
LANG:
PAGE:
11 / 20
A
EN
11

Advertisement

Table of Contents
loading

Table of Contents