4 1 Inspecting the equipment

WARNING

4 2 Unpacking the Unit

DANGER
STATUS:
Approved
© Copyright 2022 ABB. All rights reserved.
THE SYSTEM MUST BE INSTALLED IN ACCORDANCE WITH THE
APPLICABLE SAFETY REGULATIONS
INSTALLATION AND COMMISSIONING SHALL BE IN COMPLIANCE WITH
ALL APPLICABLE NATIONAL, STATE, AND LOCAL SAFETY REGULATIONS
AND MUST BE CARRIED OUT BY SUITABLY QUALIFIED PERSONS AS PER
NATIONAL, STATE, AND LOCAL REQUIREMENTS.
NOTE
RISK OF FALLING: DISMANTLING THE UPS REQUIRES WORKING AT
HEIGHT. TAKE THE NECESSARY PRECAUTIONS.
UNPACKING THE UNIT IN A LOW-TEMPERATURE ENVIRONMENT MAY
CAUSE CONDENSATION TO FORM BOTH INSIDE AND ON THE CABINET.
DO NOT INSTALL THE UNIT UNTIL THE INSIDE AND OUTSIDE OF THE
UNIT ARE DRY (RISK OF ELECTRIC SHOCK).
IF ANY EQUIPMENT HAS BEEN DAMAGED DURING SHIPMENT, KEEP
THE SHIPPING CARTONS AND PACKING MATERIALS FOR THE CARRIER
OR PLACE OF PURCHASE AND FILE A CLAIM FOR SHIPPING DAMAGE. IF
YOU DISCOVER THE DAMAGE AFTER ACCEPTANCE, FILE A CLAIM FOR
NOTE
CONCEALED DAMAGE
DISCARD OR RECYCLE THE PACKAGING IN A RESPONSIBLE MANNER OR
STORE IT FOR FUTURE USE.
PACKING MATERIALS MUST BE DISPOSED OF IN COMPLIANCE WITH ALL
LOCAL REGULATIONS CONCERNING WASTE. RECYCLING SYMBOLS ARE
PRINTED ON THE PACKING MATERIALS TO FACILITATE SORTING.