5. The following figure shows the overall
effect after cable connection.
6. Connect the PDC monitoring cable to the
RS485_1 or FE port on the MDU side panel.
(1) Monitoring cable outlet
7. (Optional) Connect the fire linkage cable
by referring to Appendix B.
8. Reinstall the transparent covers of the
input copper bar and N bar.
9. Seal the gap between cables and the
cabinet using flake sealing putty. (Remove
the paper protective film from the sealing
putty and use the aluminum foil film
together with the sealing putty.)
Flake sealing putty
9