Page 1
PDU8000 Isolation Transformer Cabinet User Manual Issue Date 2019-03-07 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Personnel requirements Personnel who plan to install or maintain Huawei equipment must receive a thorough training, understand all necessary safety precautions, and be able to perform all operations correctly.
Page 11
Huawei uses IP21 standard in isolation transformer design to ensure that live parts are not in contact with the exterior and that no foreign objects will enter the equipment during operation.
2. Only engineers certified by the manufacturer or its agents are allowed to install, commission, and maintain the isolation transformer. Otherwise, personal injury or equipment damage may occur, and the resulting isolation transformer faults are beyond the warranty scope of Huawei. 3. The figures in this document are for reference only. The actual product prevails.
Check against the delivery list that the equipment and components are correct and complete. If some components are missing or do not comply with the models in the delivery list, record the information and contact Huawei or the local Huawei office immediately.