Phase 2 - Transmitter Installation; Transmitter Location - ABB Field 264H Instructions For Installation Manual

Pressure transmitters
Table of Contents

Advertisement

PHASE 2 - TRANSMITTER INSTALLATION

3. TRANSMITTER INSTALLATION
The following examples are standard mounting locations for instrumentation suitable for these main types of applications:
3.1

TRANSMITTER LOCATION

Level measurement with open tanks
1. Mount the transmitter at the same height or below of the
lowest level to be measured.
2. Connect the transmitter to the bottom of the tank.
Pressure or absolute pressure measurement of a tank
1. Place the taps in the upper part of the tank.
2. Mount the transmitter above the elevation of the process
tap.
3. Connect the transmitter to the tank.
Max. Level
Min. Level
gate valve
gate valve
- 7 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Field 2600t seriesField 264nField 264gField 264a

Table of Contents