Air Ducts - Bosch BGH96M060B3B Installation Instructions Manual

96% afue condensing gas furnace
Table of Contents

Advertisement

7.5 Air Ducts

General requirements
The duct system should be designed and sized according to accepted national
standards such as those published by: Air Conditioning Contractors Association
(ACCA), Sheet Metal and Air Conditioning Contractors National Association
(SMACNA) or American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE) or consult The Air Systems Design Guidelines reference tables
available from your local distributor. The duct system should be sized to handle the
required system design CFM at the design external static pressure. The furnace
airflow rates are provided in Tables 4 & 5 "Air Delivery - CFM (Without Filter)".
When a furnace is installed so that the supply ducts carry air circulated by the
furnace to areas outside the space containing the furnace, the return air shall also
be handled by duct(s) sealed to the furnace cabinet and terminating outside the
space containing the furnace.
Secure ductwork with the proper fasteners for type of ductwork used. Seal supply
and return-duct connections to furnace with code approved tape or duct sealer.
Flexible connections should be used between duct work and furnace
to prevent transmission of vibration. Duct work passing through
unconditioned space should be insulated and sealed to enhance
system performance. When air conditioning is used, a vapor barrier is
recommended.
Maintain a 1-inch clearance betweem combustible materials and the supply air
ductwork for a distance of 36 inch horizontally from the furnace. See NFPA 90B or
local code for further requirements.
Ductwork acoustical treatment
Metal duct systems that do not have a 90 degree elbow and 10 ft.
of main duct to the first branch take-off may require internal acoustical
lining. As an alternative, fibrous duct work may be used if constructed
and installed in accordance with the latest edition of SMACNA
construction standard on fibrous glass ducts. Both acoustical lining and
fibrous duct work shall comply with NFPA 90B as tested by UL Standard
181 for Class 1 Rigid air ducts.
Bosch 96% AFUE Condensing Gas Furnace - BTC 770503101 J (06.2023)
Supply air connections
For a furnace not equipped with a cased coil, the outlet duct shall be provided with
a removable access panel. This opening shall be accessible when the furnace is
installed and shall be of such a size that the heat exchanger can be visually checked
for possible damage using light assistance or a probe that can be inserted for
sampling the airstream. The cover attachment shall prevent leaks.
Upflow and horizontal furnaces
Connect supply-air duct to flanges on furnace supply-air outlet. Bend flange upward
to 90° with wide duct pliers. The supply-air duct must be connected to ONLY the
furnace supply-outlet-air duct flanges or cased coil cabinet (when used).
NOTICE:
DO NOT cut main furnace cabinet side to attach supply
f
air duct, humidifier, or other accessories. All accessories
MUST be connected to duct external to main furnace
cabinet.
  For horizontal applications, the top-most flange may be bent past 90
degrees to allow the evaporator coil to hang on the flange temporarily
while the remaining attachment and sealing of the coil are performed.
Installation Instructions
| 23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents