Download Print this page

ABB KP-800 Manual page 7

Advertisement

10
KP-800, KP-1600, and KP-2000
To make it easier to make the hole in the existing switchgear door, the kit
comes complete with an adhesive template for attaching as shown (fig. 13).
See 2TSE431186P1000.
Position the template by aligning the dotted lines with the existing cut out.
Cut the door along the unbroken line and drill holes in the positions marked
by the holes (fig. 14).
Mount the dust guard escutcheon (s)(fig. 15) provided with the breaker to the
door.
Fig. 13
Fig. 15
Cut lines
NOTE: If the dotted line on the adhesive template fails to perfectly match the existing opening in the door, refer to the
instructions for installing the dust guard escutcheon provided with the circuit breaker.
1B
14x
Ø
0.2 in (5 mm)
Fig. 14
s
13.28 lb in
(1.5 Nm)

Advertisement

loading

This manual is also suitable for:

Kp-1600Kp-2000Emax 2