Download Print this page
Huawei SmartGuard 63A-S0 Quick Start Manual

Huawei SmartGuard 63A-S0 Quick Start Manual

Advertisement

Quick Links

SmartGuard
63A-(S0, AUS0)
Quick Guide
EN
快 速 指 南
ZH
Issue: 01
Part Number: 31500JHV
文档版本: 01 部件编码: 31500JHV
Scan for support
扫码获取支持
Before installing the equipment, read the user manual carefully to get familiar with product information
EN
and safety precautions. The product warranty does not cover equipment damage caused by failure to
follow the storage, transportation, installation, and usage guidelines specified in this document and the
user manual.
Log in to the technical support website (https://support.huawei.com/enterprise) to view the user manual
and safety precautions.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
安装设备前请详细阅读用户手册,了解产品信息及安全注意事项。未按照本文档与用户手册的内容存储、搬运、
ZH
安装和使用设备而导致设备损坏,不在设备质保范围内。
您可以登录技术支持网站(https://support.huawei.com/enterprise),查阅用户手册和安全注意事项等信息。
由于产品版本升级或其他原因,本文档内容会不定期进行更新。
除非另有约定,本文档仅作为使用指导,文档中的所
有陈述、信息和建议不构成任何明示或暗示的担保。
1
EN
Installation Requirements
ZH
Confirming Load Types with Owners
EN
2
ZH
业主确认负载类别
• The SmartGuard applies to a main circuit breaker of less than or equal to 63 A. If the current
EN
is greater than 63 A, do not install the SmartGuard.
• If the power of backup loads exceeds the maximum off-grid output power of the inverter, the
inverter may be shut down due to overload. In this case, you need to shut down some loads.
• SmartGuard适用家庭入户总空开≤63A,>63A请勿安装。
ZH
• 如果备电负载功率超过逆变器的离网输出最大功率,逆变器可能会过载关机,需要关闭一些负载
才能离网运行。
3
EN
Installing the Device
ZH
4
Installing a PE Cable
安装保护地线
EN
ZH
安装要求
Opening the Maintenance Compartment
EN
5
ZH
打开维护腔
EN
Preparing AC Power Cables
6
准备交流线缆
ZH
安装设备
Preparing SmartGuard Signal Cables
EN
7
ZH
准备备电盒信号线缆
Preparing EMMA Signal Cables
EN
8
准备EMMA信号线缆
ZH
EN
FE communications cable
EN
.
Apply silicone grease or paint for protection
ZH
建议涂抹硅胶或刷漆进行防护。
ZH
FE通讯线

Advertisement

loading

Summary of Contents for Huawei SmartGuard 63A-S0

  • Page 1 The product warranty does not cover equipment damage caused by failure to 准备EMMA信号线缆 follow the storage, transportation, installation, and usage guidelines specified in this document and the user manual. Log in to the technical support website (https://support.huawei.com/enterprise) to view the user manual FE communications cable FE通讯线 and safety precautions.
  • Page 2 • 漏电保护开关(RCD):备电负载前必须安装漏电保护开关,当离网运行时,入户总开关 会失去保护作用,负载发生漏电可能导致电击危险。 • 逆变器(INV):仅支持单台逆变器接入备电盒,根据逆变器型号选择端口。 Huawei Digital Power Technologies Co., Ltd. Huawei Digital Power Antuoshan Headquarters Futian, Shenzhen 518043 People's Republic of China Off-grid power-on and commissioning: Turn off the main circuit breaker in step 2 to complete the https://digitalpower.huawei.com...

This manual is also suitable for:

Smartguard 63a-aus0