Tank overcurrent protection TPPIOC
Prepare the IED for verification of settings outlined in Section
Values of the logical signals for TPPIOC are available on the local HMI under Main menu /Test /
Function status /Current Protection /TPPIOC (64, IN>>>) /TPPIOC: 1
Ensure that the maximum continuous current, supplied from the current source used for the test of
the IED, does not exceed four times the rated current value of the IED.
10.5.9.1
Function revision history
Document
revision
A
B
C
D
E
F
G
H
10.5.9.2
Verifying the signals and settings
1.
Inject current into the IED with an initial value below set value I>>>.
2.
Increase the injected current until the TRIP signal appears and note the operate value of the
tested functionality.
3.
Decrease the current slowly and note the reset value with TRIP signal resets.
10.5.9.3
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
10.6
Voltage protection
10.6.1
Two step undervoltage protection U2RWPTUV
Prepare the IED for verification of settings outlined in Section
Values of the logical signals for U2RWPTUV are available on the local HMI under Main menu /
Tests /Function status /Voltage protection /UnderVoltage2Step(27, 2(2U<)) /
U2RWPTUV(27,2(2U<)):x , where x = 1, 2.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
10.6.1.1
Verifying the settings
Railway application RER670
Commissioning manual
Product
History
revision
2.2.1
-
2.2.1
-
2.2.2
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.5
Setting I> is changed to I>>> and the maximum value is extended from 1000 %I
2000 %I
.
B
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
GUID-07652C06-4420-43ED-88DB-13BB70666988 v2
"Preparing the IED to verify
GUID-9679493F-8174-466C-9A9D-B98EA96C9CE7 v1
GUID-9B159033-3401-4CCC-9423-76AC73EA2E3F v3
GUID-22F28DEA-B320-41EA-B621-ACA9D72975D7 v1
GUID-63683861-9B68-4EC1-9EC5-86536C97A1E8 v2
"Preparing the IED to verify
Section 10
settings".
to
B
SEMOD53540-1 v1
settings".
M13796-9 v3
113

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents