Safety Summary - Hitachi AF-BCK-01 Installation And Operation Manual

Boiler combination kit
Table of Contents

Advertisement

Available languages

Available languages

Safety summary

1.2. bOILER COmbINATION kIT DIAGRAm
UTOPIA INVERTER
bOILER
2. SAFETy SUmmARy
CAUTION
Do not connect voltage input to the control system before
preparation for test run has been correctly completed.
Read this manual carefully before performing installation
work.
Read this in order to configure Boiler Combination Kit.
WARNING
Do not install Boiler Combination Kit in places like:
-
With vapour, oil or dispersed liquids.
-
WIth heat sources nearby (sulphuric surroundings).
-
Where accumulation, generation or leaks of inflammable
gases has been detected.
-
That are near the sea, in saline, acid or alkaline
surroundings.
AQUAFREE
RECEIVER
Control Boiler
Control Water Pump
Control AquaFREE
Contact for special electric price
Outdoor thermostat
WARNING
Install Boiler Combination Kit away from possible sources of
electromagnetic disturbances.
Respect local electrical standards.
Use a power circuit that is not subject to peak demands
EJP
OT
REmOTE
RADIATORS

Advertisement

Table of Contents
loading

Table of Contents