Initial Commissioning; Switching On The Tumble Dryer - Miele PDR 910 EL SOM Operating And Installation Instructions

Commercial tumble dryer
Hide thumbs Also See for PDR 910 EL SOM:
Table of Contents

Advertisement

 Risk of injury or damage to property due to improper installa-
tion.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
Before commissioning the tumble dryer for the first time, make sure
it has been installed.
Connect the tumble dryer correctly.
Please observe the instructions in "Installation".
Complete the initial commissioning process. During the initial com-
missioning process, you will need to define the settings for daily use
of the tumble dryer. Some settings can only be modified during the
initial commissioning process. After that, they can only be changed
by the Miele Customer Service Department.
These settings are also described under "Supervisor level".

Switching on the tumble dryer

Press the  button.
The welcome screen will light up.
Setting the display language
You will be asked to select the display language. You can change the
language at any time (see "Language" under "Supervisor level").
Language
english
deutsch
(CA)
english
english
(AU)
(GB)
Swipe left or right across the display with your finger until the lan-
guage you want appears.
Briefly touch the required language with your finger.
The selected language will be highlighted in orange and the display
will change to the next setting.

Initial commissioning

español
français
(F)
OK
19

Advertisement

Table of Contents
loading

Table of Contents