Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Preface Preface Purpose This document applies to the SmartLogger3000 data collector series (SmartLogger for short). Read this document before you use the SmartLogger. As a dedicated platform for photovoltaic (PV) power system monitoring and management, the SmartLogger implements the interface convergence, protocol conversion, data collection, data storage, centralized monitoring, intelligent maintenance, and remote networking functions for devices in a PV power system.
● DI1 on the SmartLogger3000 is used to detect the switch-off status and is connected to the circuit breaker switch-off status output. DI2 is used to check the switch-on status and is connected to the circuit breaker switch-on status output.
Page 26
1、The intermediate relay uses a 12 V drive coil, the contact supports 250 V AC @ 10 A or higher, and the relay is installed with a base and guide rail. 2、The intermediate relay and external power adapter are configured by the customer and are not provided by Huawei. ● Switch-off control test: Figure 4-2 After switch-off is complete, check whether the circuit breaker is OFF.