Sanyo VHR-279E Service Manual page 7

Table of Contents

Advertisement

1-2. TEMPORARILY SETTING UP AND CONNECTING CP-1 PWB ASSEMBLY
hess
CP-1 PWB Assembly < side)
>
Terminal Board
C
™A
rel
Cassette Compartment
.
Main Unit
TM-2 PWB
1-3. INSTALLATION OF THE FRONT PANEL
When installing the front panel to the chassis after repaires and adjustments.
2.
Setthe cassette door to half-opened state as shown in Fig.
1-1-5, and install the front panel to the chassis.
M-SE2U/E2-5
Jutted part of
Cassette Hold
Front Panel
Door Opener Lever
Cassette Door
(Position A)
Cassette Door
(Position B)
Fig. 1-1-5

Advertisement

Table of Contents
loading

Table of Contents