Grouting Procedure Installation; Tools And Materials - GE Innova Series Manual

Single plane and biplane pre–installation kit installation procedures
Table of Contents

Advertisement

GE Healthcare
Item
Floor plate / Base plate
Assembly
2.4 Procedure

2.4.1 Grouting Procedure Installation

The principal reason for grouting is to provide a level surface for the installation of equipment. This
will prevent distortion of the mounting structures and the operational problems resulting from a not
level condition. It, therefore, is very important the grouting procedure be carefully followed and the
pad be level to ensure proper operation of the equipment.

2.4.1.1 Tools and Materials

1. Assure the following tools for grouting:
1/2" heavy-duty double-insulated electric drill, 650 rpm or greater
Ardex T-1 Mixing Paddle, to be used with drill
Ardex T-4 Spreader, for the installation of Ardex K-15
Ardex T-5 Smoother, for feather-edging and touch-up work
25 lb (11.4 kg) scale for weighing grout
Quart (0.95 liters) jar for measuring water
Machinist Level (accuracy within .005 inch/foot) (1 part in 2400)
Ten gallon (38 liters) container
Knife and scraper
Sponge or cloth rags
1/4 inch weather stripping
Double sided tape
2. Assure the following materials for grouting:
Ardex P-51 Primer for preparation of concrete floors
Chapter 1 Installation Procedure
Single Plane and Biplane Innova Systems Pre–Installation Kit Installation Procedures
Qty
1
NOTICE
The relationship between the table base and the positioner base plate is critical.
Prior to drilling mounting holes contact local GE Medical Systems installation
specialist or lead field engineer to verify that the proper full size floor mounting
template is used.
Effectivity
-
2285632
Direction 2290880-12-1EN, Revision 1
Part#
Manufacturer
-
21

Advertisement

Table of Contents
loading

Table of Contents